Bullet Train A Reality Soon: Electrification Work Begins On Mumbai-Ahmedabad High Speed Corridor

In an official statement released by the National High-Speed Rail Corporation Ltd., it stated that in total, over 20,000 masts, ranging from 9.5 to 14.5 meters in height, will be installed along the corridor.

Leave a Reply

Your email address will not be published. Required fields are marked *