Bengaluru’s Yellow Line is scheduled to open by December with at least eight trains running every 15 minutes.
Bengaluru metro update: Yellow Line to open in December with 8 trains and 15-minute intervals – Report

Bengaluru’s Yellow Line is scheduled to open by December with at least eight trains running every 15 minutes.