Bengaluru metro update: Yellow Line to open in December with 8 trains and 15-minute intervals – Report

Bengaluru metro update: Yellow Line to open in December with 8 trains and 15-minute intervals – Report

Bengaluru’s Yellow Line is scheduled to open by December with at least eight trains running every 15 minutes.

Leave a Reply

Your email address will not be published. Required fields are marked *